1. Start
  2. The view
  3. Services
  4. Numbers
  5. Work
  6. Method
  7. Origin
  8. Notes
  9. Contact

Oil and gas engineering, United Kingdom

Closer to the answer.

Assos Tech is a small oil and gas engineering consultancy. We work on producing fields, onshore and offshore, for the operators who run them and the people who finance them. Production, facilities, produced water, wells, gas projects and the technical review behind a purchase or a loan.

In short

You send us the problem and the data. We check the numbers, find what is limiting production, and tell you what to do next and what it is worth.

Every figure we give you carries its source and its date. Where something is an estimate or a judgement, we say so. You can always see where the measurement ends and our view begins.

IThe work

The limit is usually somewhere else

A reservoir forecast is only useful if the wells can deliver it, the flowlines can carry it, the plant can separate it, the water can be disposed of and the economics still hold. On a mature field those links fail in turn. Remove one limit and the next one appears, usually in another team's spreadsheet.

We follow the chain from reservoir to export and we name the next limit before the first one is removed. Most of the work is arithmetic. A liquid capacity is converted to oil at the water cut of the wells being moved. A well is counted once. A planned date stays a planned date until there is an acceptance record.

Our clients are operators of large onshore fields in the Middle East and mature offshore assets in the North Sea, developers of gas projects in West Africa, and the investors and lenders behind them. They come to us when a decision is close: whether to approve a concept, how to restart a train, where the water will go, or what an asset is worth once its water, integrity and abandonment are priced in.

We are small on purpose. The engineer who scopes the work does the work and signs it.

How we work

Where the limit usually sits

From reservoir to export. The three streams that leave separation, and the point in the chain where each limit usually appears.

Conceptual, not for construction
ReservoirWellsFlowlinesGatheringSeparationOilStorage and exportGasFuel, sales, flareWaterTreatment, disposal, pondswell potentialintegrity, sizebackpressure, routingoil, water, gas limitsThe chainFor each link: what it has to carry, what it can carry, and what happens when it is full.
Figure 1. Removing one bottleneck exposes the next. For each link we check what it has to carry, what it can carry, and what happens when it is full.
Figure 1 · ConceptualIssued 18 October 2026 · Rev 0
IIIBy the numbers

Four numbers from recent work

Each one comes from a named document. None of them is a portfolio total.

Planned oil, four-phase restart

86.6mbd

Four phases of 21.7, 22.3, 22.1 and 20.5 thousand barrels a day. Wells brought on one at a time.

Train restart plan, 2026

Flowline ranked for replacement

67.7km

Candidate lines ranked on integrity risk, production value and overlap with other scope.

Decision paper, 2021

Hold points before first flow

5

Each released only on evidence from the field, from valve line-up to stable receipt.

Commissioning plan, 2026

Scenarios carried to 2029

3

No transfers, transfers, transfers with optimisation. Each well counted once. Water followed to disposal.

Forecast workbook, September 2026

IVSelected work

Selected work

Fourteen anonymised cases from onshore and offshore fields. Each one says what the setting was, when it was done, and on what basis. Clients, fields and facilities are not named.

Figures in the cases are planning values or dated study inputs and are labelled as such. They are not measured results and they do not imply client endorsement.

VHow we work

How we work

The same steps on every job, whether it takes two weeks or a year.

  1. i

    Agree the question

    Who decides, what they have to decide, and by when. Scope, interfaces and deliverables are written down before we start.

  2. ii

    Fix the data

    Each source is logged with its date. Measured values, operator statements, estimates and our own judgement are kept apart. Where sources disagree we show both and say which one we used.

  3. iii

    Follow the chain

    Reservoir, wells, flowlines, gathering, separation, water, gas, power, export. For each link: what it has to carry, what it can carry, and what happens when it is full.

  4. iv

    Give an answer

    Approve, approve with conditions, hold, or do not approve. The missing items are listed with an owner. Then the register, model or procedure your team can run without us.

VIThe name

The name

Assos is a Greek town on the Aegean coast. Aristotle set up his first school there in 347 BC and began working from what he could observe and measure. In modern Greek the word also means the ace. We took the name for the method, and the three words below are how we try to keep to it.

Observe

Start from the measured data, with its dates and its gaps. A model is only useful once it explains what the plant is doing today.

Endure

Build registers, models and procedures that still work after the engineer who built them has moved on. One live file per document, with the revision and the basis date inside it.

Vantage

Stand where the whole chain is visible, from reservoir to export to cash, and name the next limit before the first is removed.

The origin of the name

AssosTech · Energy · Engineering

Tell us the decision you have to make


Send us the problem and the files behind it. Within a week we will tell you what evidence it needs, how long it will take and what it will cost.

hello@assostechltd.com · 5 South Charlotte Street, Edinburgh, EH2 4AN